Find Out More About Us

The ENERGY PRODUCTION RWANDA Ltd Goal is to Provide electricity access to rural communities through establishment of a new hydropower plant and improve local business opportunities. The main activity is the Electric power production, transmission and distribution.
-
Rwanda plans to achieve 512MW installed power generation capacity by2023/24
-
Universal access (100%) by 2023/24; with on grid connections representing 52% and off-grid48%by2023/24
Power Generation mix is currently diversified as follow:
Hydro Power 48%
Thermal 32%
Solar PV5.7%
Methane-to-power 14.3%
Check our Services
Check our Objective
The main objective of the project is to construct a hydropower plant to generate 4.5MW (installed capacity) on the Mukungwa River in Northern Province of Rwanda
in order to contribute to supply electricity to rural population in the project area.
The objective of this study is to assess the feasibility of the project, outlining its technical and economic potential.
This study consists of a number of elements; project area description,
geological, topographical and hydrological investigations, project design and a bill of quantities, as well as economic analysis.
Board Directors
Our Team

Mr.HAKUNDIMANA Jean Marie Vianney
Chief Executive Officer
IZERE UWASE ADELINE
Assistance Administration/Communication
NIYITEGEKA JEAN
Director of Administration and Finance
Mr.NTIHEMUKA ALBERT
Loyer
Cyuzuzo Belise NYEMBO
Bachelors in electronics&telecommunications engineering
SEKANYAMBO THEOGENE
Auditor
SHEMARYASE SEDRICK
Accountant
ISHIMWE ERIC
Civil Engineer & Valuation
NIYIKIZA Charlotte
Electrical Engineer
NIYOMIZERO Jean Philippe
Logistics